Skip to content
SR Construction Logo
SR CONSTRUCTION SR Construction Ltd
Professional Sports Turf — Port Harcourt
ALL PROJECTS
Sports & Leisure Completed

Professional Sports Turf — Port Harcourt

Port Harcourt, Rivers State

FIFA-standard synthetic turf installation for a professional sports complex in Port Harcourt — including advanced drainage engineering, sub-base preparation, and full civil earthworks.

Client Segment

Sports Academy

01

Site survey and topographical levelling

02

Bulk earthworks and sub-grade preparation

03

Engineered aggregate sub-base (300mm compacted)

04

Perforated drainage pipe installation and soakaway connections

05

Shock pad layer installation

06

FIFA-specification synthetic turf laying and infill

07

Perimeter edging, line marking, and boundary works

The Challenge

The site had uneven natural ground with poor natural drainage — a common problem in Port Harcourt. Laying turf on unprepared ground would have resulted in waterlogging and surface failure within one wet season.

Our Approach

We started with full civil earthworks: excavation, grading, and a properly engineered sub-base with a perforated drainage network. The drainage system was tested before the shock pad and turf were installed.

The Outcome

The pitch was completed to FIFA Basic specifications. Drainage performance was verified through a flood test prior to handover. The surface has performed through two full wet seasons without reported issues.

Professional Sports Turf — Port Harcourt — Site Documentation 1
Professional Sports Turf — Port Harcourt — Site Documentation 2
Professional Sports Turf — Port Harcourt — Site Documentation 3

How much does FIFA-standard synthetic turf cost in Nigeria?

A full-size 11-a-side pitch with proper sub-base and drainage in Nigeria typically ranges from ₦80m to ₦150m+ depending on turf specification, site conditions, and drainage complexity.

What is the lifespan of synthetic turf in Nigeria's climate?

A properly installed FIFA-specification pitch with adequate drainage should last 8–12 years with regular maintenance. Poor sub-base or drainage will shorten this to 2–3 years.

Call WhatsApp